Hanseatic City Rostock
Bouygues TP S.A., Strabag, Boskalis
120m
720m
11m water depth above structure, 20m water depth to bottom of structure
Project construction
2003-05-01
6 elements made of 8 segments
2 x 2 lane with verges either side
8.5m
22.5m
On-line casting basin with dock gate for construction of
elements in batches of 2 elements at a time.
elements in batches of 2 elements at a time.
2 no. roof pontoons
Gina & omega gaskets
Watertight concrete using segmental construction
Sand flow foundation
Sand backfill, rock protection