Multi Low Tension Cable Tunnel

HEIGHT: 4.45 m OD 3.55 m ID
WIDTH: (circular)
TOTAL IMMERSED LENGTH: 288 m
FABRICATION METHOD:
Tunnel elements were cast in existing naval drydock, two
at a time.
immersed
Stockholm,
Sweden
s13
Telephone & Telegraph Department of Stockholm City
Svenska AB Christiani & Nielsen
Chdstiani & Nielsen A/S
71m
288m

Project construction

1965-04-30
4
One tube
4.45 m OD 3.55 m ID
circular
Tunnel elements were cast in existing naval drydock, two
at a time.
Two catamaran rigs
Provisional rubber seal supplemented by annular fabricreinforced
neoprene rubber strip bored from inside
Pile-supported grillages at element joints
No cover