Philipp Holzmann AG
81.78m
81.78m
Project construction
1984-04-30
1
Three tubes
5.30m
21.20m
Element was constructed in purpose-built casting basin
at river shore in tunnel line.
at river shore in tunnel line.
Underwater concrete.
Chemin de Balexert 9, Châtelaine, CH, 1219