Friedrichshagen Tunnel

TOTAL IMMERSED LENGTH: 105.8 m
DEPTH AT BOTTOM OF STRUCTURE: 10.8 m
HEIGHT: 6.67 m
WIDTH: 7.65 m
FABRICATION METHOD: In place.
SITE CONDITIONS: river
immersed
Berlin,
Germany
t4
52.9m
105.8m
10.8m

Project construction

2
One tube; Footway
6.67m
7.65m
Constructed as two pneumatic caissons. Element structure was constructed on fill
placed halfway to center of river. Excavation under this structure, which was provided
with cutting edges, allowed it to be lowered to grade below the river bottom. One side
was done at a time. The two elements were sealed at the middle joint after the second
element was at grade.
In place.
Caisson method.
Concrete joint formed in cofferdam.
Concrete filled caisson under tunnel tube.
1.5 m backfill
Reinforced